China’s innovation drive is reaching fever pitch in 2025. Let’s cut to the chase and focus on four crucial domains.
1.The Huawei Factor
Huawei is already testing its first, self-developed EUV lithography machine capable of producing 3nm chips. Trial tests are going full blast at the research center in Dongguan, and mass production should start in 2026.
It’s impossible to overstate how much of a game-changing paradigm this Chinese breatkthrough – specifically in laser-induced discharge plasma (LDP) - is
all about. It’s set to turn the seminconductor technology...more below
Ghana is interested in purchasing a floating nuclear power plant from Russia, Ghanaian Ambassador to Russian Koma Steem Jehu-Appiah told Sputnik.
"I know that our minister of energy was here last year and signed a corresponding agreement. I think this is innovative, and in a conversation with the minister of energy, he said that the country is interested.
So, Ghana could purchase such a nuclear power plant," the diplomat said when asked about the possibility of Ghana purchasing a floating nuclear power plant.
Russia and Ghana began cooperation in the field of nuclear energy after signing an intergovernmental agreement in 2015.
The agreement outlined plans for joint work in the areas of training specialists, building nuclear power plants and related infrastructure, and providing maintenance services. In October 2023, representatives of Rosatom met with the Ghanaian Ministry of Energy in Cape Town. At the meeting, Russia proposed using floating nuclear power plants to supply power to ...